Pictures of House Construction:

Construction:
[Purchase]First saw house for sale 3/5/2007. Offer made on 3/6/2007. Closed escrow on 4/17/2007.
[Wires]...still need to find them all...
[Old Ivy]Took out old Ivy 4/23/2007, Planted 6/17/2007
[Gas Shut-off]Gas shut-off installed on 5/8/2007. Chimney Sweep cleaning done on 5/1/2007.
[Washer/Dryer]Installed around 5/10/2007
[Door To Garage]Got estimate on 5/9/2007. Construction from 5/15/2007 to 5/31/2007.
[Phone/Internet/TV]Phone & internet went in on May 30, 2007. Still need TV wiring
[Plumming Problem]Occurred on May 30, 2007 and repars completed on June 1, 2007
[Attic]Installed panelling Between June 5 to June 11, 2007
[Paint]Got Estimate 5/7/2007. Painted around June 12, 13, & 14, 2007
[Carpet]Installed June 19, 2007
[Storage-Stuff]Arrived on June 21, 2007. Moved in (First night / Cat came) June 23, 2007
[Dipole]Dipole put up for Field Day June 20, 2008; Tower started Sept. 1, 2008; Taken down Aug 12, 2009
[Tower/HF Antenna]A3S & A3WS Tower Construction; start:8/5/2009; End: TBD



On the morning of May 31, 2007, the fiber optic phone line was installed to carry the Phone, Internet, and TV:

A box was attached to the side of the house that splits out the Phone, Cable and Internet signals, and wires were routed inside through the garage.

Since the fiber optic line does not power the phone, a power box, with backup battery and phone, was placed in the garage.
The phone lie was then connected to the house phone line from this unit.

The internet cable comes inside and connects to the router, which includes a wireless connection.